Phnom Penh, serving Cambodia and the region

How we work

Six stages. Every one ends with your approval.

Every Nexus Turnkey project, from a new compressor hall to a staged renovation of a running plant, follows the same six stages. Each stage produces documents you can check, and nothing moves forward until you approve it.

Stage 1 of 6

Assess & define

Survey and measure: demand and simultaneous demand, pressure profile, leaks, required ISO 8573-1 class, existing equipment, hours, power, heat and ventilation constraints, expansion plans.

What you receive

  • Survey report
  • Measured data set
  • Design basis

Approval point

You confirm the requirement everything else is built on.

Stage 2 of 6

Evaluate & select

Compare technologies, size capacity and redundancy (N+1 where downtime is costly), estimate energy and lifecycle cost, draft a preliminary layout and scope.

What you receive

  • Options comparison
  • Lifecycle-cost estimate
  • Preliminary layout

Approval point

You choose the option and the scope.

Stage 3 of 6

Engineer & approve

P&IDs, sizing and isometrics, general arrangement, foundations, ventilation, noise, condensate, electrical single-line diagram, bill of materials, control philosophy and interface schedule.

What you receive

  • P&ID
  • Piping isometrics
  • GA drawing
  • SLD
  • BOM
  • Control philosophy

Approval point

You approve the drawings before anything is ordered.

Stage 4 of 6

Supply & install

Procurement and delivery, mechanical, piping, electrical and instrumentation works, with inspection at each step.

What you receive

  • Delivery records
  • Inspection & test records

Approval point

You sign off mechanical completion.

Stage 5 of 6

Integrate & test

Controllers, PLC and SCADA; meters, dew-point and flow instruments; alarms and historian; logic and alarm tests; sequencing; staged start-up.

What you receive

  • I/O & logic test sheets
  • Alarm list
  • Sequencing settings

Approval point

You witness the integrated tests.

Stage 6 of 6

Commission & hand over

Site acceptance and performance checks, air-quality verification, punch list, training, as-builts, manuals, spares list, maintenance schedule and follow-up.

What you receive

  • SAT certificate
  • As-built drawings
  • O&M manuals
  • Spares list
  • Maintenance plan

Approval point

Final acceptance, then lifecycle support begins.

One process, six stages, no surprises

Every Nexus Turnkey project follows the same six stages, whether it is a new compressor hall, a dehumidification system for a warehouse or a staged upgrade of a running plant. Each stage produces defined outputs. Each ends with a decision you make, based on documents you can check. Nothing moves to the next stage until you have approved the one before it.

That is what turnkey means to us. Not “leave it to us and hope”, but one accountable team working through a visible process, with a paper trail you keep.

The short version of the chain is Consult → Design → Supply → Install → Commission → Serve. The six stages below are how that chain is delivered.

Stage 1: Assess and define

We find out what the plant actually needs before anyone talks about equipment.

For compressed air, that means a site survey and measurement: air demand and how much of it occurs at the same time, the pressure profile across the plant, a leak survey, the air quality each user needs expressed as an ISO 8573-1 class, an inventory of existing equipment and its condition, operating hours, and the constraints of power, heat and ventilation. We also ask where the plant is going, because a system sized only for today becomes a problem at the first expansion. For other systems the measurements differ: moisture loads for humidity control, airflow and pollutant data for emissions, heat loads for cooling. The principle is the same.

Outputs: survey findings, measured data, a defined requirement and the design basis.

Approval point: you confirm the requirement and design basis that everything else will be built on.

Stage 2: Evaluate and select

With the requirement agreed, we compare the ways to meet it.

We evaluate technology options, such as fixed speed, VSD or PM-VSD compressors, refrigerated or desiccant dryers, refrigerant or desiccant dehumidification. We size capacity and decide on redundancy, including N+1 where downtime is costly. We compare options on energy and lifecycle cost, not purchase price alone, and produce a preliminary layout and scope.

Outputs: an options comparison, energy and lifecycle-cost estimates with their assumptions, a preliminary layout and a defined scope.

Approval point: you select the option and scope to take into detailed engineering.

Stage 3: Engineer and approve

The selected option becomes a complete set of documents that says exactly what will be built.

We produce P&IDs, sizing calculations and piping isometrics, general arrangement drawings, foundation, ventilation, noise and condensate details, the electrical single-line diagram, the bill of materials, and a control philosophy with an interface schedule. Technical submittals for each item of equipment are checked against the specification.

Outputs: drawings and documents issued for review, then issued for construction.

Approval point: you approve the drawings, control philosophy and bill of materials before procurement starts.

Stage 4: Supply and install

Equipment is procured and the system is built to the approved drawings.

This covers procurement and delivery, mechanical installation, piping, electrical work and instrumentation. In a running plant, every tie-in follows a written method agreed with your production team, with temporary air or planned shutdowns where needed. Inspection records are kept at each stage, including pressure tests and electrical tests.

Outputs: the installed system and its inspection and test records.

Approval point: you confirm installation is complete and ready for integration, and agree any changeover windows in a live plant.

Stage 5: Integrate and test

The system is connected, configured and tested as a whole.

We connect machine controllers, the sequencer, PLC and SCADA where included; configure meters, dew-point and flow instruments, alarms and the historian; test the control logic and every alarm against the control philosophy; test sequencing across the demand range; and bring the plant up in stages.

Outputs: integration and test records, including logic, alarm and sequencing tests.

Approval point: you witness the key tests and agree that the system is ready for commissioning and acceptance.

Stage 6: Commission and hand over

The system is proven against the design and handed to your team.

We carry out the site acceptance test (SAT) and performance checks, verify air quality at the agreed points, record and close a punch list, and train operators and maintenance staff. You receive as-built drawings, manuals, a spares list and a maintenance schedule. We agree the after-sales arrangements, including maintenance contracts and a follow-up visit, before final acceptance.

Outputs: signed SAT and commissioning records, the handover pack and trained people.

Approval point: final acceptance.

What you receive at each stage

Stage What you receive
1. Assess and define Survey report · measured data · requirement and design basis · leak register (compressed air)
2. Evaluate and select Options comparison · energy and lifecycle-cost estimate with assumptions · preliminary layout · scope
3. Engineer and approve P&IDs · sizing calculations · isometrics · GA drawings · electrical SLD · bill of materials · control philosophy · interface schedule
4. Supply and install Delivery records · inspection records · pressure-test and electrical test records · changeover methods
5. Integrate and test Logic and alarm test records · sequencing test records · instrument configuration
6. Commission and hand over SAT certificate · performance and air-quality checks · closed punch list · as-built drawings · manuals · documented set-points · spares list · maintenance schedule · training record

Why it works this way

You decide at every stage. Each approval point is based on documents, not on promises. If a decision changes the cost or the programme, you see it before it happens.

One team carries the thread. The engineers who measured your plant are the ones who answer for whether the finished system meets the requirement they defined. Nothing is lost between a sales team, a design office and an installer.

The paper trail is yours. By the end of the project you own a complete record of what was built, how it was tested and how it should be run. Your team, or anyone you appoint later, can maintain and extend it.

Savings are measured, not promised. Where a project is justified by energy, savings are project-specific. We measure them against a baseline and verify them after implementation; we don’t promise a blanket percentage.

Where to start

Most projects start in one of three ways: a new factory or building that needs a complete system, an existing plant with a problem to solve, or a plant that wants its utilities connected and visible. Whichever applies, the first step is a conversation about what you need, followed by Stage 1.

Request a quote to start a project, or book an air audit if you want measured data first.

Engineering deliverables

What you receive, before you commit

Every stage ends in a document you can check, approve and keep. These sheets are generic samples of the format.

  • Sample
    PID-02Rev ANexus Turnkey
    P&ID excerptGeneration, treatment and storage with instrument tags, isolation and condensate routes.
  • Sample
    ISO-03Rev ANexus Turnkey
    Piping isometricRing main and drops with sizes, slopes, drain points and isolation valves.
  • Sample
    AUD-01Rev ANexus Turnkey
    Air audit reportBaseline, demand profile, ranked actions with investment and payback assumptions, verification plan.
  • Sample
    COM-04Rev ANexus Turnkey
    Commissioning checklistPre-start, functional and performance checks, signed line by line.
  • Sample
    SAT-05Rev ANexus Turnkey
    SAT certificateSite acceptance against agreed criteria, punch list and sign-off.

Next step

Start at stage one.

An assessment gives you a design basis you own, whoever you choose to build it.

Start typing to search